What is happening at EUROTEC? – Part 2: Ready for Installation 📦🔧😄
The next step in our logistics upgrade is here!
All pallets with components for our new NOYES storage system with vertical lift are now on site — neatly lined up and ready for installation. 🚀📦🙂
We captured a short video today to give you a first behind‑the‑scenes look at what’s waiting to be assembled. These parts will soon become a highly efficient system that supports our limit switch box and valve automation accessories production with faster picking and improved accuracy. ⚙️💙
👉 More updates coming soon — stay tuned as we move from preparation to installation!
auch auf LinkedIn | also on LinkedIn













